GPG will design and supply a shop-assembled auxiliary boiler that will provide the equivalent of approximately 60 MW of high pressure steam for the first phase of YCI’s methanol facility. The scope of supply will also include the fan, ductwork, combustion system, heat recovery and selective catalytic reduction equipment to meet emissions requirements.